Cubic Yard Calculator
Mulch, topsoil, gravel, sand and rock from length, width and depth.
Free calculator
Enter a slab, a footing or post holes. You get the cubic yards to order with extra for waste, and how many 80, 60 and 40 lb bags to buy.
A bag of premix says on the label how much concrete it makes. The usual yields are 0.6 cubic feet for an 80 lb bag, 0.45 for a 60 lb bag and 0.3 for a 40 lb bag. A cubic yard is 27 cubic feet, so one yard takes 45 bags of 80 lb, 60 bags of 60 lb or 90 bags of 40 lb.
| Bag | Makes | Bags per cubic yard |
|---|---|---|
| 80 lb | 0.6 cu ft | 45 |
| 60 lb | 0.45 cu ft | 60 |
| 50 lb | 0.375 cu ft | 72 |
| 40 lb | 0.3 cu ft | 90 |
You cannot buy part of a bag, so the calculator always rounds the bag count up.
A 10 x 10 foot patio 4 inches thick is 10 x 10 x 4 / 12 = 33.3 cubic feet, or 1.23 cubic yards. Add 10% for an uneven base and spills and it comes to 36.7 cubic feet (1.36 yards). That is 62 bags of 80 lb, 82 bags of 60 lb or 123 bags of 40 lb. Those are the numbers the calculator opens with.
A footing is a long, narrow slab measured in inches. A 40 foot run 12 inches wide and 12 inches deep is 40 cubic feet. With 10% extra it is 44 cubic feet, or 1.63 yards, so you would order 1.75 yards, or buy 74 bags of 80 lb. For a slab with a thick edge, put the slab in the slab fields and only the depth below the slab in the footing, so the top 4 inches are not counted twice.
A post hole is a cylinder. A 10 inch hole 36 inches deep holds 1.64 cubic feet, and a 4x4 post (3.5 inches square) fills 0.26 of that, which leaves 1.38 cubic feet of concrete per hole. Four holes with 10% extra come to 6.1 cubic feet: 11 bags of 80 lb, 14 of 60 lb or 21 of 40 lb. A common rule is a hole about three times the post width, with a third to a half of the post in the ground and the bottom below the frost line. Deck footings are set by your local code, so check it first. Setting fence posts for a customer? The fence pricing guide covers pricing the job.
Mixing 60 bags by hand is a long day. Once a pour passes about a yard, most crews call a ready-mix plant instead. Plants sell by the cubic yard, often in quarter-yard steps, and many charge extra for a small load, so ask about their smallest order. The calculator rounds the order up to the next quarter yard for you.
When the numbers are ready, put the concrete, the forms and your labor on a construction estimate your customer can sign.
About 45. An 80 lb bag makes roughly 0.6 cubic feet and a cubic yard is 27 cubic feet, so 27 / 0.6 = 45 bags. A yard takes about 60 bags of 60 lb or 90 bags of 40 lb. Check the yield printed on the bag you buy.
At 4 inches thick, a 10 x 10 slab is 33.3 cubic feet, or 1.23 cubic yards. With 10% extra for waste it is 1.36 yards, so order 1.5 yards of ready-mix, or buy 62 bags of 80 lb or 82 bags of 60 lb.
A 10 inch hole 36 inches deep around a 4x4 post holds about 1.38 cubic feet of concrete, or 1.52 with 10% extra for waste: 3 bags of 80 lb, 4 bags of 60 lb or 6 bags of 40 lb. Wider or deeper holes take more, so enter your own sizes in the post hole section.
Four inches is the usual thickness for patios, walks and shed pads. Driveways and slabs that carry heavy loads are often 5 to 6 inches. Local code and the load decide it, so check before you pour.
Bags make sense for post holes, steps and small pads. Once the pour passes about a cubic yard, 45 or more 80 lb bags, a ready-mix truck is usually easier. Ask the plant about its smallest load, since many charge extra for a short one.
No. Nothing you type is sent or stored. The math runs in your browser, with no account and no email.
See all contractor tools, or jump to a free estimate for the pour.
Mulch, topsoil, gravel, sand and rock from length, width and depth.
Cubic yards, tons and bags of sand for pavers, a sandbox or a pool base.
Cubic yards, tons and bags of gravel for a driveway, path or patio base.
Yards, tons and bags of river rock, crushed stone or pea gravel.
Convert between the two, and find the markup that lands the margin you want.
Work back from the take-home you want, your overhead, and the hours you can actually bill.
FastEstimateMaker puts the concrete, the forms and your labor on a priced estimate your customer can accept. Start free - no credit card required.
Build a real estimate freeSolo is $29.99/month with every office feature. Canvass is $59.99/month plus $19.99/month per rep seat.